Now we'll take a moment to briefly describe the process we call the exterior grade beam
pressed-piling pier system.
 
  1. Mark location of holes
     
  2. Lay out plywood to place dirt and sod
     
  3. Use hydraulic power unit to press pre-cast cement cylinders into ground until jacked refusal has been met (solid strata).
     
  4. Place cap block on top of piling cylinders that have been driven to solid strata.
     
  5. Remove all old and deteriorating caulking from exterior doors and windows.
     
  6. Using the top of the cap block, place a hydraulic jack
     
  7. Using a pre-determined sectional approach, raise areas of structure in small increments until structure's natural position has been attained.
     
  8. Secure a concrete cylinder next to the hydraulic jack and shim with steel shims.
     
  9. Remove hydraulic jacks, then size and place another pre-cast cement cylinder beside the cylinder placed in Step 8, using steel shims to secure cylinders in place.
     
  10. Place soil in top hole surrounding piling cap. Use a mounding approach to allow for soil subsidence. Remove excess soil from site.
     
  11. Discard plywood and rake areas free of debris.  Wash all concrete surface and pour new concrete as needed.

SPECIFICATIONS for concrete press piling pier
 

Requirements: Lifting and/or leveling of concrete slab structures shall be in accordance with local city building code and the requirements detailed below.
Piers: Press piling piers shall be spaced not more than 10 feet apart for single story wood frame/wood veneer structures, and not more than 8 feet apart for single story, wood frame, brick veneer or 2 story wood veneer structures.
All piers shall be pressed to load bearing strata and/or a minimum of 8,000 PSI or to "jacked refusal".
Concrete: The minimum compressive strength of the precast 6" diameter x 12" high concrete cylinder shall be 6,000 PSI with a maximum aggregate of 1/4 inch.
The minimum compressive strength of he 8"x9"x14" precast concrete trapezoid cap block shall be 6,000 PSI.
Shims: Shims are rolled plate steel and are minimum size of 2x3 inches and thickness of 1/8 inch, 3/16 inch and 1/4 inch.

For more information call us at 281-568-7000.

 

 

 

 